SCHEDULING OF WORKS

Objective

Work scheduling involves determining the need for maintenance activities for the technical managers of an infrastructure network over a given period. This includes specifying the nature of the work (light maintenance, medium maintenance, heavy maintenance) and its distribution across the entire surveyed network to maintain it in a satisfactory condition relative to its purpose (freight transport, passenger transport).

This service plays a crucial role in establishing an overall budget for network maintenance for the managers.

How?

To carry out this service, we rely on an audit of the infrastructure network.

To achieve this, it is necessary to collect data from the network, primarily through a survey of deteriorations. These data provide insights into the health of the network, and it is rated according to the manager’s rating system (for example: Excellent, Good, Poor, Very Poor).

Based on this rating, the maintenance needs are determined (for example: light, medium, heavy) and tailored to each manager’s requirements.

CONTACT US

REQUEST A QUOTE!

 

Interested in availing our services?

    MORE INFORMATIONS?

     

    Do you have any doubts about the service you need, or would you like to obtain more information?