[MISSION] – Intervention for CD92

NextRoad controls a construction site in Châtenay-Malabry, with recycled materials at the heart of the project!

[MISSION] – Inspection of pavement reinforcement works on the Sancy roads (France)

Reinforcement work on Sancy roads: find out all about the project!

At NextRoad, we are committed to the effective preservation of our road heritage. 🛣

A well-maintained road means greater safety, lower costs and reduced environmental impact. Find out more about the good practices to adopt!

[MISSION] – Auscultation of 180 km in the Nièvre department thanks to NextBike!

180 km of greenways surveyed in the Nièvre department, find out more about NextBike!

[MISSION] – RN 149 Supervision of repair work

NextRoad ensures the quality of roadworks on the RN 149. Find out more about the mission !

The NextRoad Algorithm: Analyzing, Qualifying, and Weighing the Causes of Roadway Degradation

Our article in the RGRA is available. Find it in full.

[MISSION] – Load-bearing capacity check at Haut Cabardès wind farm

NextRoad ensured the safety of the wind turbine platforms by controlling the load-bearing capacity required for maintenance. Discover the mission!

[MISSION] – Night-time roadworks on the RN 149

Find out how NextRoad supervised the night-time roadworks on the RN 149 to ensure the safety and durability of the road surface !

Astra and NextBike in the spotlight in the Nièvre department

NextRoad presented the ASTRA and NextBike in the Nièvre department (58) to monitor the department’s roads and greenways. Find out more about this innovative equipment !

[MISSION] – Intervention on the A31

Find out more about the new mission of our Centre-Est agency, which oversaw work on the A31 motorway on behalf of APRR.